N CENTER ST over UPRR

RENO · County 031, Nevada · Built 2006 · 3 Lanes · 9,300 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 7 Good
Substructure 7 Good

Location

39.528706, -119.812456

This bridge is in worse condition than 35.2% of bridges in County 031. The average bridge in Nevada is 0 years old; this one is 20 years old.

Nearby Bridges

Bridge Details

Structure #
G2775
Year Built
2006
Length
17.3 m (56.8 ft)
Max Span
16.4 m
Width
23.1 m (75.8 ft)
Lanes
3
Daily Traffic
9,300
Material
Prestressed Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.