HARMON AV over I-15 INDUSTRIAL FSD

LAS VEGAS · County 003, Nevada · Built 2003 · 6 Lanes · 11,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
H2263
Year Built
2003
Length
194.1 m (636.8 ft)
Max Span
42.7 m
Width
26.1 m (85.6 ft)
Lanes
6
Daily Traffic
11,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.