I 15 RAMP TO SP. M over RAMP FLAMINGO TO I 15

LAS VEGAS · County 003, Nevada · Built 1999 · 2 Lanes · 17,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
H2015
Year Built
1999
Length
154.5 m (506.9 ft)
Max Span
59.4 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
17,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.