I 15 over UPRR

LAS VEGAS · County 003, Nevada · Built 1964 · 6 Lanes · 121,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
G 805S
Year Built
1964
Length
97.8 m (320.9 ft)
Max Span
36.6 m
Width
32.8 m (107.6 ft)
Lanes
6
Daily Traffic
121,500
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,485,000
Total Project Cost
$2,228,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.