VINE ST over I 80

RENO · County 031, Nevada · Built 1973 · 2 Lanes · 1,550 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 7 Good
Substructure 7 Good

Location

39.531164, -119.826453

This bridge is in worse condition than 62.1% of bridges in County 031. The average bridge in Nevada is 0 years old; this one is 53 years old.

Nearby Bridges

Bridge Details

Structure #
H1199
Year Built
1973
Length
234.7 m (770 ft)
Max Span
63.1 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
1,550
Material
Steel Continuous
Design
Box Beam or Girders - Multiple
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.