I 15 over DUCK CREEK

SOUTH OF SILVERADO · County 003, Nevada · Built 2013 · 8 Lanes · 118,000 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
B3150
Year Built
2013
Length
13.1 m (43 ft)
Max Span
4.9 m
Lanes
8
Daily Traffic
118,000
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.