SILVERADO RANCH BL over CHANNEL

SOUTH LAS VEGAS · County 003, Nevada · Built 2008 · 9 Lanes · 16,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
B2801
Year Built
2008
Length
32 m (105 ft)
Max Span
31.2 m
Width
48 m (157.5 ft)
Lanes
9
Daily Traffic
16,000
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.