W. CHARLESTON BLVD over CHANNEL

LAS VEGAS · County 003, Nevada · Built 1992 · 6 Lanes · 5,500 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
B2543
Year Built
1992
Length
8.4 m (27.6 ft)
Max Span
2.5 m
Lanes
6
Daily Traffic
5,500
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.