HUALAPAI WAY over DRY WASH
1.4KM S OF W.CHARLESTON · County 003, Nevada · Built 1998 · 7 Lanes · 24,500 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
36.148658, -115.315544
This bridge is in worse condition than 82.9% of bridges in County 003. The average bridge in Nevada is 0 years old; this one is 28 years old.
Nearby Bridges
TOWN CENTER DR over DRAINAGE
Built 1996
W. CHARLESTON BLVD over CHANNEL
Built 1992
TOWN CENTER DR over GOLF CART PATH
Built 1996
SR589 SAHARA AVE over CC 215
Built 2000
CC-215N over SUMMERLIN CENTRE DR
Built 2000
CC-215S over SUMMERLIN CENTRE DR
Built 2000
CHARLESTON BL over CC 215 WESTERN BELTWAY
Built 2000
TOWN CENTER DRIVE over DRY WASH
Built 1995
HUALAPAI WY over DRY WASH
Built 1998
W.DESERT INN ROAD over I 215 WESTERN BELTWAY
Built 2000
Bridge Details
- Structure #
- B2417
- Year Built
- 1998
- Length
- 9.4 m (30.8 ft)
- Max Span
- 1.6 m
- Lanes
- 7
- Daily Traffic
- 24,500
- Material
- Concrete
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $359,000
- Total Project Cost
- $539,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.