HORIZON DRIVE over DRY CHANNEL
HENDERSON · County 003, Nevada · Built 1999 · 6 Lanes · 16,100 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
36.017372, -115.054772
This bridge is in worse condition than 82.9% of bridges in County 003. The average bridge in Nevada is 0 years old; this one is 27 years old.
Nearby Bridges
FLORES over CHANNEL
Built 2004
ASPEN BAY LN over LOWER PITTMAN WASH
Built 2012
AMADOR LANE over DRY WASH
Built 1999
HORIZON RIDGE PW over DRY WASH
Built 1996
ARROYO GRANDE BL over DRY WASH
Built 1997
AQUA LANE over LOWER PITTMAN WASH
Built 2004
ARROYO GRANDE BL over DRY WASH
Built 1997
VALLEY VERDE over GREEN VALLEY CHANNEL
Built 1998
PASEO VERDE PWY over CHANNEL
Built 2004
ARROYO GRANDE over CHANNEL
Built 1999
Bridge Details
- Structure #
- B2429
- Year Built
- 1999
- Length
- 20 m (65.6 ft)
- Max Span
- 3.5 m
- Lanes
- 6
- Daily Traffic
- 16,100
- Material
- Concrete
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.