CAMINO AL NORTE ST over GOWAN RETENTION BASIN
NORTH WEST LAS VEGA · County 003, Nevada · Built 1991 · 5 Lanes · 18,900 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
36.252025, -115.153022
This bridge is in worse condition than 82.9% of bridges in County 003. The average bridge in Nevada is 0 years old; this one is 35 years old.
Nearby Bridges
CAMINO AL NORTE over GOWAN DETENTION BASIN
Built 1995
COMMERCE ST over W LV TRIB WASH
Built 1998
COMMERCE ST over DRAINAGE CHANNEL
Built 1994
CLAYTON STREET over LAS VEGAS CHANNEL
Built 2000
HAMMER LANE over LAS VEGAS CHANNEL
Built 1999
REVERE ST over CHANNEL
Built 1995
SR 573/CRAIG RD over DRY WASH
Built 1984
CLAYTON ST over DRAINAGE
Built 2008
N 5TH STREET over UPPER MENDENHALL CHNL
Built 1989
LONE MTN RD over ROSADA CHANNEL
Built 1994
Bridge Details
- Structure #
- B2197
- Year Built
- 1991
- Length
- 19.6 m (64.3 ft)
- Max Span
- 9.5 m
- Lanes
- 5
- Daily Traffic
- 18,900
- Material
- Concrete
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.