CAMINO AL NORTE over GOWAN DETENTION BASIN
NORTH WEST LAS VEGAS · County 003, Nevada · Built 1995 · 5 Lanes · 30,000 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
36.243069, -115.160339
This bridge is in worse condition than 56% of bridges in County 003. The average bridge in Nevada is 0 years old; this one is 31 years old.
Nearby Bridges
CLAYTON ST over DRAINAGE
Built 2008
REVERE ST over CHANNEL
Built 1995
CAMINO AL NORTE ST over GOWAN RETENTION BASIN
Built 1991
LONE MTN RD over ROSADA CHANNEL
Built 1994
COMMERCE ST over W LV TRIB WASH
Built 1998
COMMERCE ST over DRAINAGE CHANNEL
Built 1994
N SIMMONS ST over GOWAN OUTFALL CHANNEL
Built 1990
CLAYTON STREET over LAS VEGAS CHANNEL
Built 2000
HAMMER LANE over LAS VEGAS CHANNEL
Built 1999
SR 573/CRAIG RD over DRY WASH
Built 1984
Bridge Details
- Structure #
- B2158
- Year Built
- 1995
- Length
- 15.7 m (51.5 ft)
- Max Span
- 7.6 m
- Lanes
- 5
- Daily Traffic
- 30,000
- Material
- Concrete
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.