SHADY AV over GOLD CANYON CRK

DAYTON · County 019, Nevada · Built 1945 · 1 Lanes · 128 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Critical
Deck
5
Fair
Superstructure
1
Imminent Failure
Substructure
6
Satisfactory

Bridge Details

Structure #
B1711
Year Built
1945
Reconstructed
1986
Length
7 m (23 ft)
Max Span
5.2 m
Width
5.3 m (17.4 ft)
Lanes
1
Daily Traffic
128
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$107,000
Total Project Cost
$161,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.