SR 822 DAYTON VLY over CARSON RVR

DAYTON · County 019, Nevada · Built 1956 · 4 Lanes · 11,200 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B 637
Year Built
1956
Reconstructed
1991
Length
64.9 m (212.9 ft)
Max Span
26.5 m
Width
20.9 m (68.6 ft)
Lanes
4
Daily Traffic
11,200
Material
Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,290,000
Total Project Cost
$1,936,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.