4062-LV: RED ROCK over Sandstone Quarry Wash

2.9 mi from Red Rock VC · County 003, Nevada · Built 2016 · 2 Lanes · 8,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0000000L2016541
Year Built
2016
Length
46.6 m (152.9 ft)
Max Span
12.5 m
Width
9.5 m (31.2 ft)
Lanes
2
Daily Traffic
8,000
Material
Concrete Continuous
Design
Slab
Owner
Bureau of Land Management
Last Inspected
N/A
Est. Improvement
$28,000
Total Project Cost
$31,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.