SUMMERLIN PARKWAY over FUTURE RAMP(SP9)
WEST OF LAS VEGAS · County 003, Nevada · Built 2009 · 5 Lanes · 2,500 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
36.191839, -115.344758
This bridge is in worse condition than 56% of bridges in County 003. The average bridge in Nevada is 0 years old; this one is 17 years old.
Nearby Bridges
SUMMERLIN PKWY over CC 215
Built 2010
LAURELGLEN DR over PEDESTRIAN
Built 1998
FAR HILLS AVENUE over CC 215
Built 2009
FAR HILLS DR over PEDESTRIAN
Built 1998
LAKE MEAD BLVD over CC 215 WEST
Built 2009
ANASAZI DR over SUMMERLIN PW
Built 2006
BUTTON WILLOW DR. over DRAINAGE CHANNEL
Built 1989
ALTA DRIVE over CC 215
Built 2004
CRESTDALE LN over CHANNEL
Built 1999
PARKING LOT ACCESS over DRY WASH
Built 1998
Bridge Details
- Structure #
- I2337
- Year Built
- 2009
- Length
- 22.9 m (75.1 ft)
- Max Span
- 21.9 m
- Width
- 39.4 m (129.3 ft)
- Lanes
- 5
- Daily Traffic
- 2,500
- Material
- Concrete
- Design
- Box Beam or Girders - Single or Spread
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.