CAMINO REAL over CRISTOPHERS COVE LAKE

CAMINO REAL @ 22ND ST · County 141, Nebraska · Built 1980 · 1 Lanes · 100 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
U054515315P
Year Built
1980
Reconstructed
2013
Length
24.4 m (80.1 ft)
Max Span
24.1 m
Width
4.5 m (14.8 ft)
Lanes
1
Daily Traffic
100
Material
Steel
Design
Truss - Thru
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.