3RD AVE COLUMBUS over UPRR
3RD AVE AND UPRR · County 141, Nebraska · Built 2017 · 2 Lanes · 2,410 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
41.43, -97.3293
This bridge is in worse condition than 19.1% of bridges in County 141. The average bridge in Nebraska is 0 years old; this one is 9 years old.
Nearby Bridges
CAMINO REAL over CRISTOPHERS COVE LAKE
Built 1980
US30 over LOST CREEK
Built 1982
12TH AVE over UPRR
Built 2020
COLL 7693 over LOST CREEK
Built 2011
3RD AVE over LOST CREEK
Built 2018
TOWNSHIP ROAD over COLUMBUS GENOA CANAL
Built 2007
US30/US81 over UPRR 816-734-H
Built 2008
COLL 7692 over LOST CREEK FLOOD PROJ
Built 1983
US30/US81 over PARK SUBWAY
Built 1931
TOWNSHIP ROAD over COLUMBUS GENOA CANAL
Built 1935
Bridge Details
- Structure #
- U054505000
- Year Built
- 2017
- Length
- 107.9 m (354 ft)
- Max Span
- 46.3 m
- Width
- 10.2 m (33.5 ft)
- Lanes
- 2
- Daily Traffic
- 2,410
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.