RAMP G over N2/US77/RAMP C
LINCOLN SOUTH BELTWAY · County 109, Nebraska · Built 2022 · 1 Lanes
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
40.6883, -96.7048
This bridge is in worse condition than 43% of bridges in County 109. The average bridge in Nebraska is 0 years old; this one is 4 years old.
Nearby Bridges
US77 over SALT CREEK TRIBUTARY
Built 2022
N2 over SALT CREEK TRIBUTARY
Built 2022
RAMP C over EB/WB N2 AND RAMP F
Built 2022
NB US77 over EB/WB N2 AND RAMP F
Built 2021
RAMP F over SB US77
Built 2022
N2 over SALT CREEK TRIBUTARY
Built 2020
SALTILLO ROAD over US77/N2
Built 2022
N2 over 25TH ST
Built 2022
SO. 25TH ST. over STREAM (T 22)
Built 1967
N2 over 25TH ST
Built 2022
Bridge Details
- Structure #
- S077 05335A
- Year Built
- 2022
- Length
- 652.9 m (2142.1 ft)
- Max Span
- 86.9 m
- Width
- 9.2 m (30.2 ft)
- Lanes
- 1
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.