N2 over 25TH ST

LINCOLN SOUTH BELTWAY · County 109, Nebraska · Built 2022 · 2 Lanes · 1,610 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 9 Excellent
Superstructure 9 Excellent
Substructure 8 Very Good

Location

40.690644, -96.690369

This bridge is in worse condition than 43% of bridges in County 109. The average bridge in Nebraska is 0 years old; this one is 4 years old.

Nearby Bridges

Bridge Details

Structure #
S002 46038R
Year Built
2022
Length
46.3 m (151.9 ft)
Max Span
18.3 m
Width
13.6 m (44.6 ft)
Lanes
2
Daily Traffic
1,610
Material
Prestressed Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.