N21 over THIRTY MILE CANAL

6S COZAD · County 047, Nebraska · Built 1961 · 2 Lanes · 985 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
S021 00738
Year Built
1961
Reconstructed
1995
Length
8.2 m (26.9 ft)
Max Span
2.4 m
Lanes
2
Daily Traffic
985
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.