N21 over PLATTE RIVER

1S COZAD · County 047, Nebraska · Built 1987 · 2 Lanes · 1,755 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
S021 01167
Year Built
1987
Length
205.7 m (674.9 ft)
Max Span
20.4 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
1,755
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.