MAIN STREET over YANKEE CREEK

CRAB ORCHARD MAIN @ GEHR · County 097, Nebraska · Built 2009 · 2 Lanes · 240 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
M059502805
Year Built
2009
Length
39.6 m (129.9 ft)
Max Span
15.8 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
240
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.