COUNTY HIGHWAY over STREAM

1W CRAB ORCHARD · County 097, Nebraska · Built 1982 · 2 Lanes · 20 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
C004910305
Year Built
1982
Length
12.2 m (40 ft)
Max Span
11.9 m
Width
7.5 m (24.6 ft)
Lanes
2
Daily Traffic
20
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.