6TH ST SW over SUN RIVER

GREAT FALLS-6TH ST SW · County 013, Montana · Built 1980 · 5 Lanes · 13,800 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
U05201000+01031
Year Built
1980
Length
154.2 m (505.9 ft)
Max Span
38.7 m
Width
33.2 m (108.9 ft)
Lanes
5
Daily Traffic
13,800
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,279,000
Total Project Cost
$4,919,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.