BRANCH I 15-U.S. 8 over RR

GREAT FALLS · County 013, Montana · Built 1946 · 3 Lanes · 6,326 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
I00315001+00691
Year Built
1946
Reconstructed
1996
Length
54.2 m (177.8 ft)
Max Span
20.4 m
Width
14.5 m (47.6 ft)
Lanes
3
Daily Traffic
6,326
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$503,000
Total Project Cost
$755,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.