S 556-THOMPSON R R over THOMPSON RIVER
25M SW MARION · County 029, Montana · Built 1994 · 2 Lanes · 61 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.940939, -114.975122
This bridge is in worse condition than 71.6% of bridges in County 029. The average bridge in Montana is 0 years old; this one is 32 years old.
Bridge Details
- Structure #
- S00556037+07091
- Year Built
- 1994
- Length
- 18.3 m (60 ft)
- Max Span
- 18 m
- Width
- 7.9 m (25.9 ft)
- Lanes
- 2
- Daily Traffic
- 61
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.