S 556-THOMPSON R R over BIG ROCK CREEK

35M SW MARION · County 089, Montana · Built 2009 · 2 Lanes · 56 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
S00556028+01001
Year Built
2009
Length
15 m (49.2 ft)
Max Span
15 m
Width
5.9 m (19.4 ft)
Lanes
2
Daily Traffic
56
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.