CONRAD DUPUYER RD over DRAINAGE
9M NW CONRAD · County 073, Montana · Built 1965 · 2 Lanes · 59 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
48.203406, -112.112036
This bridge is in worse condition than 53.1% of bridges in County 073. The average bridge in Montana is 0 years old; this one is 61 years old.
Nearby Bridges
MESSENGER RD over NO NAME COULEE 072
Built 1960
MESSENGER RD over DRY FK MARIAS RIVER 073
Built 1988
BLUE SKY RD over NO NAME DITCH 076
Built 2020
DRY FORK RD over IRRIGATION CANAL 085
Built 2013
MESSENGER ROAD over NO NAME DITCH 074
Built 2023
DRY FORK RD over SPRING CREEK 050
Built 1987
DRY FORK RD over DRY FK MARIAS 051
Built 1985
WILLIAMS RD over NO NAME DITCH 053
Built 1960
HAWKEYE RD over PONDERA COULEE 047
Built 1950
E LAKE RD over LAKE FRANCIS CANAL 075
Built 1960
Bridge Details
- Structure #
- S00534018+05001
- Year Built
- 1965
- Length
- 7.3 m (24 ft)
- Max Span
- 7.3 m
- Width
- 7.4 m (24.3 ft)
- Lanes
- 2
- Daily Traffic
- 59
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.