DRY FORK RD over IRRIGATION CANAL 085
3M N CONRAD · County 073, Montana · Built 2013 · 2 Lanes · 53 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
48.207447, -112.005147
This bridge is in worse condition than 14.6% of bridges in County 073. The average bridge in Montana is 0 years old; this one is 13 years old.
Nearby Bridges
DRY FORK RD over SPRING CREEK 050
Built 1987
DRY FORK RD over DRY FK MARIAS 051
Built 1985
HILLSIDE RD over NO NAME DITCH 049
Built 1960
US HWY 91 N over DRY FORK MARIAS 080
Built 1931
MESSENGER RD over NO NAME COULEE 072
Built 1960
I 15 over DRY FORK MARIAS RIVER
Built 1972
I 15 over DRY FORK MARIAS RIVER
Built 1972
I 15 over RR
Built 1972
I 15 over RR
Built 1972
S 21-S MAIN ST over PONDERA COULEE
Built 1934
Bridge Details
- Structure #
- L37001012+06001
- Year Built
- 2013
- Length
- 7.9 m (25.9 ft)
- Max Span
- 7.7 m
- Lanes
- 2
- Daily Traffic
- 53
- Material
- Aluminum, Wrought Iron, or Cast Iron
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.