IRR - S 314 over DAVIS CREEK

3M SW BUSBY · County 003, Montana · Built 1983 · 2 Lanes · 388 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

45.505756, -107.000472

This bridge is in worse condition than 13.5% of bridges in County 003. The average bridge in Montana is 0 years old; this one is 43 years old.

Nearby Bridges

Bridge Details

Structure #
S00314042+03731
Year Built
1983
Length
17.1 m (56.1 ft)
Max Span
16.8 m
Width
9.2 m (30.2 ft)
Lanes
2
Daily Traffic
388
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.