IRR BIA RTE 228 over ROSEBUD CREEK
18 KM WEST OF LAME DEER · County 003, Montana · Built 1983 · 1 Lanes · 10 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
45.587433, -106.850992
This bridge is in worse condition than 86.5% of bridges in County 003. The average bridge in Montana is 0 years old; this one is 43 years old.
Bridge Details
- Structure #
- 00000000000C725
- Year Built
- 1983
- Length
- 15.4 m (50.5 ft)
- Max Span
- 15.2 m
- Width
- 4.3 m (14.1 ft)
- Lanes
- 1
- Daily Traffic
- 10
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- Bureau of Indian Affairs
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $52,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.