MAIN BOULDER RD over BOULDER RIVER

3M NE MCLEOD · County 097, Montana · Built 1950 · 2 Lanes · 529 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
S00298013+00001
Year Built
1950
Length
46.6 m (152.9 ft)
Max Span
17.7 m
Width
6.9 m (22.6 ft)
Lanes
2
Daily Traffic
529
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$184,000
Total Project Cost
$230,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.