MAIN BOULDER RD over BOULDER RIVER

8M S BIG TIMBER · County 097, Montana · Built 1975 · 2 Lanes · 529 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
S00298008+05001
Year Built
1975
Length
62.8 m (206 ft)
Max Span
21.6 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
529
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.