IRR - S 251 over DRAINAGE

20M NE POPLAR · County 085, Montana · Built 1948 · 2 Lanes · 145 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 6 Satisfactory
Substructure 6 Satisfactory

Location

48.328897, -105.083589

This bridge is in worse condition than 36.8% of bridges in County 085. The average bridge in Montana is 0 years old; this one is 78 years old.

Nearby Bridges

Bridge Details

Structure #
S00251015+05001
Year Built
1948
Length
7.9 m (25.9 ft)
Max Span
7.6 m
Width
8.3 m (27.2 ft)
Lanes
2
Daily Traffic
145
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.