HIGHWOOD RD over BELT CREEK
6M S HIGHWOOD · County 013, Montana · Built 2009 · 2 Lanes · 459 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
47.549853, -110.886939
This bridge is in worse condition than 4.3% of bridges in County 013. The average bridge in Montana is 0 years old; this one is 17 years old.
Nearby Bridges
E HIGHWOOD RD over BELT CREEK 002
Built 1935
SHEPHERD X-ING RD over HIGHWOOD CREEK 001
Built 2017
BROADWAY AVE over HIGHWOOD CREEK
Built 1999
HIGHWOOD RD over RED COULEE
Built 1941
UPPER HIGHWOOD CR over HIGHWOOD CREEK 039
Built 2020
UPPER HIGHWOOD CR over HIGHWOOD CREEK 040
Built 2023
UPPER HIGHWOOD CR. over HIGHWOOD CREEK 076
Built 2024
LANDER CROSSING over HIGHWOOD CREEK 060
Built 1986
SALEM RD over BELT CREEK 071
Built 1998
UPPER HIGHWOOD CR over HIGHWOOD CREEK 069
Built 1969
Bridge Details
- Structure #
- S00228016+04001
- Year Built
- 2009
- Length
- 83 m (272.3 ft)
- Max Span
- 39 m
- Width
- 9.7 m (31.8 ft)
- Lanes
- 2
- Daily Traffic
- 459
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.