SHEPHERD X-ING RD over HIGHWOOD CREEK 001

4M NW HIGHWOOD · County 015, Montana · Built 2017 · 2 Lanes · 100 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000002546
Year Built
2017
Length
22.8 m (74.8 ft)
Max Span
21.9 m
Width
8 m (26.2 ft)
Lanes
2
Daily Traffic
100
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$93,000
Total Project Cost
$140,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.