FRONTAGE RD-S 205 over CAMP CREEK
2M SE MANHATTAN · County 031, Montana · Built 1920 · 2 Lanes · 2,274 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
45.839836, -111.299672
This bridge is in worse condition than 23.1% of bridges in County 031. The average bridge in Montana is 0 years old; this one is 106 years old.
Nearby Bridges
I 90 over CAMP CREEK
Built 1965
I 90 over CAMP CREEK
Built 1965
FRONTAGE RD-S 205 over BAKER CREEK
Built 1921
I 90 over BAKER CREEK
Built 1965
I 90 over BAKER CREEK
Built 1965
FRONTAGE RD-S 205 over RR
Built 2010
I 90 over SEP HEEB ROAD
Built 1965
I 90 over SEP HEEB ROAD
Built 1965
MANHATTAN S RD over IRRIGATION CANAL 117
Built 1956
W DRY CREEK RD over BAKER CREEK
Built 1967
Bridge Details
- Structure #
- S00205012+08751
- Year Built
- 1920
- Reconstructed
- 1934
- Length
- 13 m (42.7 ft)
- Max Span
- 12.2 m
- Width
- 9.5 m (31.2 ft)
- Lanes
- 2
- Daily Traffic
- 2,274
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $80,000
- Total Project Cost
- $120,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.