FRONTAGE RD-S 205 over RR
MANHATTAN · County 031, Montana · Built 2010 · 2 Lanes · 2,274 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
45.846994, -111.314422
This bridge is in worse condition than 23.1% of bridges in County 031. The average bridge in Montana is 0 years old; this one is 16 years old.
Nearby Bridges
MANHATTAN S RD over IRRIGATION CANAL 117
Built 1956
I 90 over MANHATTAN SOUTH RD
Built 1964
I 90 over MANHATTAN SOUTH RD
Built 1964
FRONTAGE RD-S 205 over CAMP CREEK
Built 1920
I 90 over CAMP CREEK
Built 1965
I 90 over CAMP CREEK
Built 1965
FRONTAGE RD-S 205 over BAKER CREEK
Built 1921
I 90 over BAKER CREEK
Built 1965
W DRY CREEK RD over BAKER CREEK
Built 1967
I 90 over BAKER CREEK
Built 1965
Bridge Details
- Structure #
- S00205011+09551
- Year Built
- 2010
- Length
- 114 m (374 ft)
- Max Span
- 44 m
- Width
- 12.6 m (41.3 ft)
- Lanes
- 2
- Daily Traffic
- 2,274
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $849,000
- Total Project Cost
- $1,274,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.