IRR - S 13 over MIDWAY COULEE
21M S SCOBEY · County 085, Montana · Built 1932 · 2 Lanes · 229 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
48.489314, -105.430864
This bridge is in worse condition than 75.4% of bridges in County 085. The average bridge in Montana is 0 years old; this one is 94 years old.
Bridge Details
- Structure #
- P00032030+00701
- Year Built
- 1932
- Reconstructed
- 1976
- Length
- 17.7 m (58.1 ft)
- Max Span
- 5.8 m
- Width
- 8.3 m (27.2 ft)
- Lanes
- 2
- Daily Traffic
- 229
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.