IRR - S 13 over BOX ELDER CREEK

23M NE WOLF POINT · County 085, Montana · Built 2019 · 2 Lanes · 229 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

48.350439, -105.452906

This bridge is in worse condition than 26.3% of bridges in County 085. The average bridge in Montana is 0 years old; this one is 7 years old.

Nearby Bridges

Bridge Details

Structure #
P00032020+03171
Year Built
2019
Length
33.3 m (109.3 ft)
Max Span
32.2 m
Width
12 m (39.4 ft)
Lanes
2
Daily Traffic
229
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.