IRR - S 13 over BOX ELDER CREEK
23M NE WOLF POINT · County 085, Montana · Built 2019 · 2 Lanes · 229 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
48.350439, -105.452906
This bridge is in worse condition than 26.3% of bridges in County 085. The average bridge in Montana is 0 years old; this one is 7 years old.
Bridge Details
- Structure #
- P00032020+03171
- Year Built
- 2019
- Length
- 33.3 m (109.3 ft)
- Max Span
- 32.2 m
- Width
- 12 m (39.4 ft)
- Lanes
- 2
- Daily Traffic
- 229
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.