US 93 over N FORK BEAR CREEK

1M S VICTOR · County 081, Montana · Built 2011 · 4 Lanes · 13,924 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
P00007058+03341
Year Built
2011
Length
21.8 m (71.5 ft)
Max Span
21 m
Width
27.4 m (89.9 ft)
Lanes
4
Daily Traffic
13,924
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.