US 93 over S FORK BEAR CREEK

2M S VICTOR · County 081, Montana · Built 2011 · 4 Lanes · 13,924 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
P00007057+00491
Year Built
2011
Length
37.1 m (121.7 ft)
Max Span
36.3 m
Width
27.4 m (89.9 ft)
Lanes
4
Daily Traffic
13,924
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.