E GRIFFIN DR over E GALLATIN RIVER 090

1M N BOZEMAN · County 031, Montana · Built 1989 · 2 Lanes · 7,375 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
M16012000+00101
Year Built
1989
Length
16.2 m (53.1 ft)
Max Span
15.2 m
Width
8 m (26.2 ft)
Lanes
2
Daily Traffic
7,375
Material
Prestressed Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.