CANAL RD over BRAZIL CREEK 079
3M W GLASGOW · County 105, Montana · Built 2013 · 2 Lanes · 100 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
48.204892, -106.685808
This bridge is in worse condition than 24.3% of bridges in County 105. The average bridge in Montana is 0 years old; this one is 13 years old.
Nearby Bridges
TAMPICO RD over MILK RIVER
Built 1960
S 117 over MILK RIVER
Built 1957
TAMPICO RD over CHERRY CREEK OVERFLOW
Built 1960
BENTONITE RD over VANDALIA SOUTH CANAL 089
Built 1938
BRAZIL CREEK RD over VANDALIA SOUTH CANAL 113
Built 1988
AITKEN RD over CHERRY CREEK 080
Built 1938
2ND AVE S-TAMPICO over CHERRY CREEK
Built 1989
US 2 over CHERRY CREEK
Built 1979
AITKEN RD over MILK RIVER 081
Built 1997
US 2 over CHERRY CREEK OVERFLOW
Built 1980
Bridge Details
- Structure #
- L53582001+06001
- Year Built
- 2013
- Length
- 37.4 m (122.7 ft)
- Max Span
- 36.6 m
- Width
- 8.1 m (26.6 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $143,000
- Total Project Cost
- $215,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.