AITKEN RD over CHERRY CREEK 080
SW EDGE GLASGOW · County 105, Montana · Built 1938 · 2 Lanes · 100 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
48.193328, -106.654089
This bridge is in worse condition than 67% of bridges in County 105. The average bridge in Montana is 0 years old; this one is 88 years old.
Nearby Bridges
AITKEN RD over MILK RIVER 081
Built 1997
2ND AVE S-TAMPICO over CHERRY CREEK
Built 1989
TAMPICO RD over CHERRY CREEK OVERFLOW
Built 1960
TAMPICO RD over MILK RIVER
Built 1960
S 117 over MILK RIVER
Built 1957
US 2 over CHERRY CREEK OVERFLOW
Built 1980
BRAZIL CREEK RD over VANDALIA SOUTH CANAL 113
Built 1988
CANAL RD over BRAZIL CREEK 079
Built 2013
US 2 over CHERRY CREEK
Built 1979
BENTONITE RD over VANDALIA SOUTH CANAL 089
Built 1938
Bridge Details
- Structure #
- L53578000+02001
- Year Built
- 1938
- Reconstructed
- 2006
- Length
- 48.8 m (160.1 ft)
- Max Span
- 8.7 m
- Width
- 6.7 m (22 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $209,000
- Total Project Cost
- $262,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.