BILLINGSLEY RD over VANDALIA SOUTH CANAL 076
10M NW GLASGOW · County 105, Montana · Built 2012 · 2 Lanes · 100 vehicles/day
Overall
Culvert
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 5 | Fair |
Location
48.259036, -106.802094
This bridge is in worse condition than 67% of bridges in County 105. The average bridge in Montana is 0 years old; this one is 14 years old.
Nearby Bridges
LIBERTY RD over VANDALIA SOUTH CANAL 097
Built 2013
TAMPICO RD over ANTELOPE CREEK
Built 1980
TAMPICO RD N over MILK RIVER 094
Built 2002
BILLINGSLEY RD over VANDALIA SOUTH CANAL 074
Built 1997
TAMPICO RD over VANDALIA SOUTH CANAL 003
Built 2002
OBERG RD over VANDALIA SOUTH CANAL 078
Built 1989
RIVERSIDE DR over DRAINAGE 096
Built 2000
US 2 over Mooney Coulee
Built 2024
US 2 over Chapman Coulee
Built 2024
TAMPICO RD N over BUGGY CREEK 095
Built 2000
Bridge Details
- Structure #
- L53509007+02001
- Year Built
- 2012
- Length
- 6.6 m (21.7 ft)
- Max Span
- 6.6 m
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Aluminum, Wrought Iron, or Cast Iron
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.