US 2 over Mooney Coulee

6M NW GLasgow · County 105, Montana · Built 2024 · 2 Lanes · 1,484 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000202405115
Year Built
2024
Length
30.5 m (100.1 ft)
Max Span
30.5 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
1,484
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.