COUNTY ROAD 129 over USBR MAIN CANAL 067
6M SW FAIRVIEW · County 083, Montana · Built 2015 · 2 Lanes · 73 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.776183, -104.128697
This bridge is in worse condition than 10.3% of bridges in County 083. The average bridge in Montana is 0 years old; this one is 11 years old.
Nearby Bridges
COUNTY ROAD 128 over USBR MAIN CANAL 089
Built 1997
COUNTY ROAD 130 over USBR MAIN CANAL 066
Built 2009
COUNTY ROAD 130 over FIRST HAY CREEK 098
Built 2009
COUNTY ROAD 202 over FIRST HAY CREEK 024
Built 1997
COUNTY ROAD 127 over USBR MAIN CANAL 053
Built 2015
COUNTY ROAD 131 over USBR MAIN CANAL 072
Built 2000
S 200 over FIRST HAY CREEK
Built 1986
COUNTY ROAD 350 over USBR MAIN CANAL 025
Built 2003
COUNTY ROAD 131 over USBR MAIN CANAL 080
Built 1998
S 200 over SECOND HAY CREEK
Built 1986
Bridge Details
- Structure #
- L42210000+05001
- Year Built
- 2015
- Length
- 19.5 m (64 ft)
- Max Span
- 18.9 m
- Width
- 10.1 m (33.1 ft)
- Lanes
- 2
- Daily Traffic
- 73
- Material
- Prestressed Concrete
- Design
- Channel Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.