I 15 FRONTAGE RD over BOULDER RIVER 043
2M W BASIN · County 043, Montana · Built 1985 · 1 Lanes · 100 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
46.263492, -112.284594
This bridge is in worse condition than 19.9% of bridges in County 043. The average bridge in Montana is 0 years old; this one is 41 years old.
Nearby Bridges
I 15 over BOULDER RIVER
Built 1985
I 15 over BOULDER RIVER
Built 1985
I 15 FRONTAGE RD over BOULDER RIVER 046
Built 1985
I 15 over BOULDER RIVER
Built 1985
I 15 over BOULDER RIVER
Built 1985
I 15 over BOULDER RIVER
Built 1985
I 15 FRONTAGE RD over BOULDER RIVER 042
Built 1985
I 15 over BOULDER RIVER
Built 1985
BASIN CREEK RD over BASIN CREEK 032
Built 1960
BASIN ST over BASIN CREEK 040
Built 1931
Bridge Details
- Structure #
- L22099010+05001
- Year Built
- 1985
- Length
- 30.6 m (100.4 ft)
- Max Span
- 15.4 m
- Width
- 4.4 m (14.4 ft)
- Lanes
- 1
- Daily Traffic
- 100
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.